Station Epidemic Prevention And Control Container House Project

Station Epidemic Prevention and Control Container House Project in Xinzheng High-speed Railway 

Project Introduction

Project Name: Xinzheng High-speed Railway Station Epidemic Prevention Security Housing Project

Client name: China Construction Seventh Bureau

Project Location: Xinzheng

Quantity of products: more than 140 sets of packing boxes

Product category: packing room

Product function: isolation room, toilet, shower room, leisure activity area, etc.

3.1(001)


Project Overview

The K-home Group cooperated perfectly with the China Construction Seventh Bureau and Xinzheng High-speed Railway Station, and completed the delivery of the construction project of the high-speed railway station for epidemic prevention and control in the shortest time. It covers an area of about 3,500 square meters and provides 140 guaranteed houses. It can accommodate more than 260 people at the same time.

The K-home container house factory has a large inventory of raw materials. In order to ensure the construction of the high-speed rail station's anti-epidemic housing as scheduled, we will speed up the production progress as much as possible, and provide high-quality, efficient, high-quality, high-efficiency, classified and closed-loop management for the Xinzheng high-speed rail station. Under the guidance of our installation team, the overall construction and installation of the project was completed within two weeks.

 

Internal Display

In the face of the complex and changeable global epidemic situation, K-home has continuously improved the functional design of isolation rooms and isolation hospitals for high-risk environments such as airports, stations, and hospitals, so that they can better meet the requirements of isolation. According to the actual situation, the functions of the room are more diversified and the living comfort is improved.  

container hospital interior


container toilet


After learning about the project, the group attached great importance to the project. The factory worked overtime for production. The on-site workers also worked hard day and night, and completed the overall construction and installation of the project in two weeks based on high quality and strict standards.