Container Toilet
In past work experience, the place where the demand for container house toilets is relatively large is the construction site. Even the container toilets on the same construction site are not exactly the same. For example, the container toilets required by migrant workers' dormitories require larger space, but there are many pits and urinals used, so the limited space must be fully utilized in the design. In the project office, the design of the container toilet not only needs to take into account the space utilization, but also the aesthetic effect.
Description
In past work experience, the place where the demand for container house toilets is relatively large is the construction site. Even the container toilets on the same construction site are not exactly the same. For example, the container toilets required by migrant workers' dormitories require larger space, but there are many pits and urinals used, so the limited space must be fully utilized in the design. In the project office, the design of the container toilet not only needs to take into account the space utilization, but also the aesthetic effect.

How much is the container house plus the toilet
Container houses and toilets generally have this demand. Container toilets used on construction sites or other sites need to be customized, and customization varies from person to person and under local conditions. The prices of container houses and toilets are different, generally simple 4- The price of 6 pits + 3 urinals is about 15,000 yuan - 20,000 yuan
What to do with the bathroom and toilet in the container house
The container room bathing toilet is a design that combines multiple functions. In fact, it is similar to the requirements of the domestic bathroom. The domestic bathroom has the tasks of bathing and toileting, and many solutions exist.
There are two mainstream solutions at the moment: one is to directly connect the electric water heater, the electric water heater can keep hot water for 24 hours, and you can take a hot shower at any time, and the other solution is the solar water heater. The advantages of this solution are obvious. , that is, energy saving, no need to spend electricity; but if it is winter, the water pipeline may freeze and crack, so some protection measures are needed.
How to drain a container house toilet
How to deal with the drainage system of the container house toilet? In fact, the drainage system of the container house is also relatively simple. You only need to lay the drainage pipe on the bottom beam of the container, and then build a beam on the top of the drainage pipe to raise the ground to the top of the drainage pipe, which can solve the drainage of the container toilet.

So, how are the drainage pipes and circuit pipes in the bathroom arranged?
First of all, you don't need to worry that this will be an overly complicated job. For all the steps you need to operate on-site, we will prepare the corresponding installation drawings and instruction videos for you in advance. These customer services will minimize the difficulty of your on-site installation.
Pre-buried pipes in toilets?
The term "buried pipeline" will appear in the description of hydropower drawings. It means that the water and electricity lines and pipes are pre-buried while building the movable panel house. The pre-embedding of water and electricity lines and pipelines should start with the prefab house project. The overall line pipeline is buried in the house structure and cannot be seen from the outside.

1. If the drainage pipes are pre-buried, the drainage pipes should be concentrated outside the house.
2. The drainage outlet also needs to be reserved indoors, and the drainage outlet should be slightly lower than the ground.
3. The slope of the drain pipe should be kept between 10-20%.
4. The indoor pipeline is to be introduced into the centralized drainage pipeline well.
5. Laying of toilet pipes in movable board rooms:
1) The toilet should be 32cm away from the center of the wall, and the opening should be 150cm away.
2) The water from the water outlet should be 25cm away from the center of the wall, and the opening should be 60cm away.
3) The floor drain is preset to be 25cm away from the center of the wall and 60cm away from the opening.
4) If the water pipe goes through the wall, it should be about 30-40cm above the ground.

Pre-embedded circuit of prefab house:
The prefabricated house is generally a steel structure frame, and the method of pre-buying the pipeline is different from that of high-rise buildings, details as follows:
1. The prefab house must take lightning protection measures.
2. Switches, sockets, pipes, and junction boxes of distribution boxes must be pre-buried when building walls.
Note that the pre-embedded height of the junction box should be 2mm higher than the wall, and the junction box and pipes should be pre-embedded in the ring beam.
3. Self-built houses generally use prefabricated panels, so the pipes of the lamps should be wrapped around the head of the prefabricated panel in the ring beam and embedded in the panel seam.
4. If the partition wall needs to be slotted and buried.
What should be paid attention to in the pre-buried line pipeline of the prefab house?
1. Pre-buried pipelines should avoid three-dimensional crossings.
If three-dimensional crossings cannot be avoided, they must exceed 2 layers of pipelines.
2. Pre-embedded pipelines on the floor must be arranged in the middle of the upper and lower layers of steel mesh.
3. The distribution points of the embedded pipelines should be set in a radial distribution, and try to avoid close parallel arrangement, so as not to affect the subsequent construction.
4. After pre-embedding, use tape to seal the pipeline opening to prevent mortar or other debris from falling into it and causing a blockage.
5. The embedded pipeline must be two points and one line, but not horizontal and vertical.
6. When pre-embedding water and electricity in the prefabricated house, you can only do the pre-embedding of lamps and air-conditioning pipes, leaving a line hole, drainage hole, and water supply hole in the floor.
We can do other pipelines in the later decoration. If too many lines and pipes are embedded in advance, the stability of the prefab house will be affected, resulting in potential safety hazards.
The pre-buried water and electricity of the prefabricated house is a relatively secret and important project. If there is a problem in the later stage, it will be more troublesome to repair, so we should pay more attention during the construction.

Why Us?
Easy Make Decision
If you need such a mobile toilet, you can contact us to customize it exclusively for you. From the interior facilities to the exterior structure, it can be customized according to your needs.
Thoughtfulness in transportation
We will carefully check each part before the goods are loaded into the shipping container, and mark its name, purpose, and quantity for you, which will significantly reduce the loss of time and
manpower during your installation.
No Worry Installation
We provide a complete set of installation tools, Step by Step Installation Video, Customized Drawing, and 7/24 Service for remote instruction. Our local engineers can supply the installation guidance on-site as well.
Hot Tags: container toilet, China, suppliers, manufacturers, factory, customized, buy, low price, for sale










